| Location: | Norwood |
| Year: | 2026 |
The works included the preparation and construction of the new building structure, starting with site clearance and progressing through the basement and upper floors.
The main works included:
Overall, the works progressed the building from the initial site preparation and below-ground drainage through to the main structural frame, slabs, walls and stairs up to Level 5.