Our drainage works include reduced-level digging for runs, installation of pipework and chambers, gullies, attenuation tanks, pumping chambers, and final connection to the adopted network. We coordinate drainage with substructure concrete, ground beams, external works levels, and Section 278 tie-ins to resolve clashes before slabs or finishes go down. We also integrate drainage delivery with our foundations and groundworks packages, so clients only deal with one accountable contractor in the early phase works.
We operate with strict safety management around excavation and confined working. Our supervisors hold recognised UK construction qualifications and monitor fall levels, quality, and compliance with the design. Each installation is recorded and handed over with full as-built information so the main contractor and client have confidence in final adoption.
Why Choose EE Structures
We know drainage is often a source of delay. Our approach is to plan routes, depths, cover levels and access points alongside foundations and externals, so drainage is installed once and signed off once. This protects the programme and prevents costly re-excavation. We maintain tidy, controlled working areas and manage plant and spoil movements to minimise disruption on live sites.
The result is a compliant, properly graded system ready for inspection and adoption, with full documentation. Our clients value that they can point to one team for substructure, drainage and externals rather than trying to coordinate multiple subcontractors.