Basement work demands control. We coordinate reduced-level digging, sheet piling or other retention systems, propping, drainage, waterproof concrete, and structural RC walls and slabs. We construct retaining walls, lift pits, plant rooms and cores within tight tolerances so that the basement can be handed over as plant space, parking, storage or usable accommodation. Our supervisors and managers hold recognised UK qualifications and maintain strict health and safety management around excavation, confined spaces and lifting operations.
Our package can include connection to main drainage, installation of sumps and pump chambers, construction of stairs and lift cores and preparation for service penetrations. By letting us handle the entire basement phase, clients avoid fragmented responsibility at the most sensitive stage of the build and keep the programme under control.
Why Choose EE Structures
We are used to working on constrained urban sites where access, noise, and vibration are tightly controlled and where surrounding structures must be protected. We plan sequencing, plant movements and deliveries early to keep excavation and basement pours progressing safely and efficiently. We also enforce stringent HSE standards on live and sensitive sites.
Our aim is to hand over a clean, waterproof and structurally compliant basement ready for follow-on trades. We document each stage, record pour history, and confirm tolerances so that clients receive not only a finished structure but also evidence that it was built correctly.